Between Christian Krohgs gate and the River Akerselva, this redevelopment brings together the transformation of Oslo’s industrial heritage and new timber construction.
The proposal aims to revitalise a central site close to Oslo Central Station, opening connections to the river and introducing shops, restaurants and more active street frontages.
The existing buildings date from 1899 to 1946 and reflect successive stages of development, with structures combining load-bearing brickwork, cast iron and reinforced concrete. Our conceptual structural design addressed the complex sequence of partial demolition, refurbishment and strengthening needed to retain and adapt these buildings.
The proposal adds four storeys to the buildings dating from 1899 and 1946. A factory building from 1929 is to be replaced by a new riverside building on the same footprint. Timber is proposed for all new construction, taking advantage of its low weight and environmental benefits. New piles extending to rock and underpinning of all existing load-bearing elements form part of the foundation strategy across the site.
Retained façades and structural elements are combined with new construction, material reuse and circular design principles. This approach supports Entra’s environmental ambitions for the project, encompassing greenhouse gas emissions, energy performance and materials.
A passage through the building will connect Christian Krohgs gate directly to the riverside. Green roofs are intended to support biodiversity, while the development prioritises access on foot and by bicycle, with no car parking included.
Our scope covered structural engineering during the conceptual design stage.